The historical record shows significant increases in MTR occurring in the last two decades: from 77,000 acres in 1985 to over 272,000 acres in 2005, a 250% increase. Also increased was the size of the individual mines, with some reaching over 15 square miles. In regards to ridge tops, over 2,700 ridges were impacted by mining.
MTR PROJECT - OVERVIEW OF RESULTS
Mountaintop Removal Mines
Total MTR Mined Area since 1976 = 445,792 Acres
Largest Single Mined Area = 10,410 Acres
Median Mined Area = 128 Acres
Average Mined Area = 406 Acres
Number of Mines > 1 mile2 = 73
Ridge Tops
Number of Ridges Mined = 2,789
Total Acres of Impacted Ridges = 130,655 Acres
Average Ridge Length Mined = 1/2 Mile
Largest Ridge Removed = 504 Acres
Historical Analysis (Acres Directly Impacted by Mining)


0 comments:
Post a Comment